KPMG Lakehouse Learning and Development Center Orlando, Florida

 

BCI Integrated Solutions had the opportunity to provide multiple solutions for KPMG’s Lakehouse Learning and Development Center in the Lake Nona community of Orlando, Florida. BCI provided and installed the Structured Cabling, Access Control, CCTV and Code Blue and Intercom Systems for the center.

Spread across a 55-acre campus adjacent to Orlando International Airport, KPMG’s learning center includes 800 single-occupancy guest rooms, 90 learning and innovation spaces, a 1,000-seat assembly hall, and the Ignition Center, for professional and client meetings. The campus also offers guests multiple dining areas, a social venue and a 15,000 square foot fitness center.

The layout and logistics of KPMG were extensive. There are over 12,000 copper stations with three million feet of Category 6A cable for data, AV, exercise equipment, point of sale locations, WAPS and Security. Additionally, there are over 3,000 strands of multimode and single mode fiber across 38 internal IDF rooms and four remote locations on the campus.

Along with network cabling, BCI provided security solutions and access control integrations at KPMG. A Salto access control system was installed to integrate into the hotel wireless lock system; an Axis/Exacq CCTV monitoring system with 280 cameras across the campus. BCI also provided 13 code blue emergency call stations around the campus and Stentofon internal intercoms for door access. There were also lift arm gates installed at each vehicle entrance and exit.

Request a Free Consultation

Have Questions? Call or visit us!

Corporate Headquarters:
9419 Corporate Lake Dr.
Tampa, FL 33634

Toll-Free Phone: 877.616.2538
Office Phone: 813.249.1020

Need Service? Click Here.